Find new opportunities across AI search and SEO.

AI search and SEO.

Try free for 7 days
Outperform your search competitors.
Outperform your search competitors.Search now spans Google, ChatGPT, and beyond—and Semrush gives you the SEO and AI visibility tools to stay visible everywhere:
See how AI platforms talk about you
Discover valuable topics to cover
Get AI-powered strategy suggestions
Build keyword plans with personalized insights
Identify fixes to improve technical health
Benchmark yourself against competitors
Outperform your search competitors.
10M marketing professionals have already used Semrush
Outperform your search competitors.
Outperform your search competitors.
Outperform your search competitors.

What Is Page Speed & How to Improve It

Our subject matter experts have reviewed this article to ensure it meets the highest standard for accurate information and guidance. Learn more about our editorial standards and process.
8 min read
January 20, 2025
Contributors: Sydney Go and Simon Fogg

What Is Page Speed?

Page speed (sometimes called “load speed”) is a measure of how fast the content of a webpage loads. 

However, page speed is not a single metric. 

A page loads in stages. As such, page speed is an umbrella term for several different measurements, such as:

  • Time to First Byte (TTFB): How long it takes for the page to start loading

  • First Contentful Paint (FCP): How long it takes for the user to see the first element of a page (e.g., an image)

  • First Input Delay (FID): How long it takes for your site to respond to a user input (e.g., a button click)

  • Onload time: How long it takes to fully load the page content

Sometimes users see a blank page at first. Then some elements load. Finally, the entire page finishes loading.

the process of how a page loads

Page speed metrics measure each of these events. These metrics show how fast a page loads compared to Google’s thresholds.

Keep reading to learn why page speed matters for SEO and how to improve it.

Why Is Page Speed Important for SEO?

Page load speed is important for SEO because it’s a confirmed ranking factor on both desktop and mobile. 

Google has stated outright that extremely slow pages are less likely to rank well. 

Google cares about page speed, because slow sites provide a poor user experience (UX). 

the probability of users bouncing increases as page load time increases

Users are more likely to bounce (leave pages) that take more than three seconds to load. 

As a result, Google recommends that pages meet “Good” thresholds for key page speed metrics.

How to Check Your Page Load Time

Here are two of the best tools to check your page load time. And how to use them.

PageSpeed Insights

Google’s PageSpeed Insights is a free tool that measures a webpage’s performance. 

Use PageSpeed Insights to: 

  • Check your page load time

  • Get performance data

  • Get tips for improving your page

  • Measure Core Web Vitals (i.e., three key UX metrics)

Here’s how to use Google’s PageSpeed Insights tool:

  1. Open PageSpeed Insights

  2. Enter the page URL in the search bar

  3. Click “Analyze”

url entered into pagespeed insights tool

Toggle between “Mobile” and “Desktop” metrics at the top of the report.

Below this, you’ll see an overall assessment of the page’s Core Web Vitals performance: “Passed” or “Failed.” 

You’ll also find a breakdown of the Core Web Vital metrics and other page speed metrics. Plus detailed page speed diagnostics and tips.

core web vitals report highlighted with all six metrics and their scores for that page

Semrush Site Audit

Semrush Site Audit checks page speed and web performance for all your pages. Not just one page (like PageSpeed Insights). 

Site Audit performs over 140 on-page and technical SEO checks. 

To check your page speed, open the tool and enter your domain. Click “Start Audit.”

domain entered into site audit tool

Configure your audit settings, then click “Start Site Audit.”

site audit settings pop up

To check your load speed, performance issues, and more, click “View details” under “Site Performance.” 

site performance thematic report highlighted

To see how quickly your pages load (in seconds), check “Page (HTML) Load Speed” and “Avg. Page (HTML) Load Speed.” 

page load speed and average page load speed modules highlighted

You’ll also see a list of “Performance Issues.” Fix “Errors” first, then address “Warnings.”

site performance issues highlighted including page size, redirects, page speed, uncompressed pages and files

8 Ways to Improve Your Page Speed SEO

When you run a page or site through a page speed tool, you’ll see many recommendations. The following methods can help you speed up your pages.

1. Choose the Right Image Format

Choosing the right image format is a sure way to optimize your page speed. 

Different image formats yield different file sizes. Some formats compress more than others.

Common formats include:

  • JPEG: Good for real-life images (photographs)

  • PNG: Good for screenshots, designs, logos, or images that require more detail

  • GIFs: Slower to load. For animated images, consider converting GIFs into videos.

  • WebP: Lighter than JPEG and PNG (up to three times smaller). However, some browsers do not support WebP yet.

2. Compress Your Images

Compress your images to improve load times. Large images slow down pages. And impact SEO. 

Keep your image file sizes as small as you can without impacting image quality.

You can do this by resizing images using a free image resizer.

Simply upload your image to the tool (such as PicResize) and select how much you want to reduce your image size by (e.g., 50% smaller).

picture of corgi entered into tool with option to resize the picture smaller by 50%

Optimize images further with a tool like ImageOptim.

file dropped into image optim tool shows file size savings of 36%

Always do this before uploading images to your site.

3. Enable Browser Caching

Enabling browser caching allows webpage data to be temporarily stored in the user’s browser. 

Browser caching means returning users see faster load times. Because fewer elements need to load (e.g., images and CSS files). 

For WordPress sites, plugins like W3 Total Cache or WP Rocket can enable browser caching.

W3 Total Cache homepage

4. Minify JavaScript, CSS, and HTML

Minifying JavaScript, CSS, and HTML reduces file sizes, which can improve your page speed.

Minification removes unnecessary code elements (e.g., line breaks and whitespace), allowing computers to read code faster. 

For instance, here’s an example of unminified CSS code: 

body {
font: 36px Arial, sans-serif;
}
/* Main container */
#container {
color: white;
background: #ffbd17;
width: 630px;
height: 160px;
display: flex;
justify-content: center;
align-items: center;
}
/* Content */
#content {
background: #333;
flex: 0 0 10px;
}

And here’s what the same CSS code snippet looks like after minification:

body{font:36px 
Arial,sans-serif}#container{color:#fff;background:#ffbd17;width:630px;
height:160px;display:flex;justify-content:center;align-items:center}
#content{background:#333;flex:0 0 10px}

How do you know if your code needs minification?

Use Site Audit, which flags pages with unminified JavaScript and CSS.

To find which pages need minification, click “Issues” in your Site Audit report. Then click on the relevant issue to get a full list of affected pages.

unminified file issues highlighted

Then use an online minifier tool or a WordPress plugin like WP Rocket to minify the affected code.

5. Use a Content Delivery Network

Using a content delivery network(CDN) reduces page loading times for users. 

A CDN is a system of servers distributed around the world. 

CDNs bring your site “closer” to users by loading a cached version of your site from a server closer to the user’s physical location.

For example, if you cache your site on a CDN, a user in Australia will receive your site from a local server, rather than from a server in Los Angeles. 

This reduces loading times.

without cdn shows connection time between server and user as 3 seconds. While the CDN acts as an intermediary between server and user, reducing the connection time to 1 second

CDN providers include Cloudflare and Jetpack.

6. Improve Your Server Response Time

Improve your server response time to reduce load speeds.

When a user requests a page, the browser makes a request. The server receives the request and fetches the requested files. Slow server response times cause slow page load speeds.

server response time or ttfb is shown as the client sends a request to the server which sends a response back to the client

How do you improve your site’s server response time? 

Consider upgrading your hosting plan to a faster option. For example a virtual private server (VPS) is faster than shared hosting. 

Here are some other things you can try:

  • Optimize your server’s application logic and configuration

  • Index database tables or upgrade your database system

  • Add more random-access memory (RAM) and processing power

Consult your hosting provider or a developer for help implementing these steps.

7. Reduce Redirects

Reducing redirects removes extra loading steps, improving page speeds. 

A redirect occurs when a user clicks on one URL but is automatically sent to a different URL. Such as an updated version of a blog post. 

Redirects are useful for SEO and user experience. 

Redirecting web traffic from an old or outdated page to a relevant new page preserves search performance. And avoids broken pages and 404 error responses.

However, sometimes redirect chains occur (when a page redirects the user several times).

a redirect chain is url A redirecting to url B which redirects to url C

Each redirect adds an extra step to the page loading process, which slows down the page speed. Which means removing unnecessary redirects can boost your page speed.

Use Site Audit tool to find unnecessary redirects. 

Open the “Issues” tab and type “redirect” in the search bar. 

You’ll see a list of “Errors,” “Warnings,” and “Notices” related to redirects. Including:

  • Redirect chains and loops 

  • Temporary redirects 

  • Permanent redirects 

redirect issues highlighted in site audit

Review all identified redirect chains, loops, and unnecessary redirects. Click on the link within each issue to see a list of affected pages.

The report will show each page’s redirect type and number of redirects:

list of page urls with a temporary redirect including the initial redirect, final destination url, and status code

Remove extra redirects by redirecting the original URL directly to the final URL.

8. Reduce HTTP Requests

HTTP requests happen when a web browser sends a “request” to a website’s server for more information.

When a user visits a page, the server receives a request from the browser. It responds with a file containing text, images, or multimedia. The user can’t view the file until the request finishes.

If the file doesn’t include all the information needed to view the page, the browser sends another request. Each additional request slows page speed and makes the user wait longer to see the entire page.

Reduce or speed up HTTP requests to improve your page speed.

To view a page’s number of HTTP requests, use Google Chrome. Open your page in Chrome, right-click anywhere on the page, and choose “Inspect.”

right click to inspect option highlighted

A Chrome DevTools window will open. Click on the “Network” tab. 

Navigate to network tab

Reload the page to see all the HTTP requests (including requests for images, plugins, JavaScript or CSS files). As well as the file size and the time it takes to load each file.

data collected in network tab

You’ll also see a total request count in the bottom-left corner. 

number of total requests highlighted

Lowering the number of HTTP requests should improve page speed. 

There’s no specific number to aim for, but as a frame of reference, the median number of HTTP requests is 76 for desktop and 70 for mobile. 

Optimize Your Technical SEO

Page speed is a key part of technical SEO. It impacts both search rankings and user experience.

To assess your site’s technical health, including page speed, use the SEO Audit tool. It provides a detailed analysis and recommends steps to improve performance.

Start optimizing your site today with a free site audit. And take the first step toward higher rankings and happier users.

Share
Author Photo

Marilyn Wilkinson is an accomplished SEO and digital marketing expert with ten years of experience. She has created content and run campaigns for some of the world’s largest brands and many fast-growing tech startups.

Share
Add Semrush as a preferred source in Google SearchTells Google to show you more from Semrush in AI, Search, and Discover.

Most popular pages

Best Service by harisseotool.xyz